Projects

Please browse our past and present maintenance and construction projects by clicking on the links below
Process Infrastructure Construction
Client: Xstrata Ltd
Year: 2013
Location: McArthur River Mine, NT
Contract Value: $3.5M

Extension of two process buildings at the McArthur River Mine.

Process Plant Construction Rectification and Commissioning
Client: MCC Mining (WA) Pty Ltd
Year: 2013
Location: Sino Iron Project, Pilbara WA
Contract Value: $5M

KG provided a commissioning and rectification team for the commissioning of Lines 1 and 2 at the Sino Iron Project

Cooling Water Circuit SMP Construction
Client: MCC Mining (WA) Pty Ltd
Year: 2012
Location: Sino Iron Project, Pilbara WA
Contract Value: $18M

Structural, mechanical and piping installation for the Sino Iron Project cooling water system.

Process Plant Pipework Installation
Client: MCC Mining (WA) Pty Ltd
Year: 2012
Location: Sino Iron Project, Pilbara WA
Contract Value: $8M

Pipework installation for the Concentrator and associated infrastructure

Thickener Sample Station SMP Installation
Client: MCC Mining (WA) Pty Ltd
Year: 2012
Location: Sino Iron Project, Pilbara WA
Contract Value: $4M

Structural, mechanical and piping installation of the thickener sample station, floc plant and overflow water systems